What is a Final Construction Drawing?
- Prepare your documents: final construction drawings, engineering, energy rating, title, and any planning permit (if required).
- Appoint a private building surveyor. Research and choose a registered private surveyor, or ask council to allocate one.
- Lodge your application. Submit your plans and documents to the surveyor.
- The surveyor checks compliance with building regulations and may request changes or extra reports.
- Once everything complies, the surveyor issues your Building Permit, giving you legal approval to start work.
How Do I Obtain This Document?
- Prepare your property address, lot/plan number, and the year of the project.
- Call or email your building designer and share these details with them.
Request the final endorsed plans.
Ask specifically for the
final construction drawings submitted for your Building Permit.
- They may send you a
PDF or provide
printed copies (sometimes for a small admin fee).